November 2026 · #30DayMapChallenge 2026 · Day 12

Day 12 - Power: The Crete-Peloponnese Cable

The 175 km power cable that links Crete to the mainland grid, at its charted position: chainage, depth along the route and crossings with telecom cables. The route on the grid operator's network map lies up to 2.2 km from where the cable is charted.

Printed map
Printed A4 map of the sea between western Crete and the south-eastern Peloponnese, with the power cable drawn in red from Chania to Vatika Bay, shaded darker where the sea is deeper, ticked every kilometre and labelled every 10 km; a dashed line beside it shows the route on the grid operator's map; two circles mark crossings with telecom cables; a depth profile along the route sits in the legend

Downloads

Prompt: Power.

Since 2021, Crete has drawn part of its electricity from the mainland through a 150 kV cable to the Peloponnese. This map treats it the way a survey firm treats a cable route: as a line with a chainage. Distance along the route is given in kilometre points (KP), counted from the substation near Chania (KP 0). The route crosses 33 km of Crete to Kissamos Bay, runs 132 km under the sea past Antikythera and Kythira, and comes ashore in Vatika Bay for the last 10 km to the Peloponnese grid.

The colour of the line is the water depth beneath it, from the EMODnet Bathymetry surface, in four bands from light red (less than 250 m) to dark red (750-1,000 m). The deepest point is 972 m at KP 80.7, in the strait between Crete and Antikythera. The profile in the legend shows the same depths along the route, in the same colours. At a 100 m grid the steepest slopes are smoothed, so the real seabed is rougher than the profile shows.

Two positions for one cable

The grid operator, ADMIE, shows the cable on its online network map. That line is schematic. The cable’s charted position comes from the Hellenic Navy Hydrographic Service: in April 2021 its Notices to Mariners added the cable to six nautical charts as lists of WGS 84 points, with ADMIE as the source of the positions. The 2021 issues are no longer on the service’s website, so I read them from the Wayback Machine’s copy of the old site. Notice 70/2021 gives 37 points from the Kissamos shore to the Vatika shore, and that is the route on the map.

Against it, the network map’s line is a median of about 1 km off, more than 1 km for half the submarine section and up to 2.2 km near Kythira. It is drawn dashed beside the charted route. For anything that touches the seabed, such as anchoring, fishing or a new cable, the charted position is the one that counts.

Crossings and lengths

Two telecom cables charted by France’s hydrographic office, SHOM, cross the route, at KP 64.8 and KP 76.6. Open data does not hold every cable on the seabed, so these are the crossings that open data shows, not a full list.

Measure Length
On the UTM zone 34N grid 175.30 km
On the GGRS87 / Greek Grid 175.20 km
On the ellipsoid 175.27 km

The same line measures 100 m differently on two official grids. Transverse Mercator grids stretch distances away from their central meridian and shrink them near it. The route lies 2-3° east of UTM 34N’s meridian at 21° E, where grid distances come out longer than on the ellipsoid, and close to the Greek Grid’s 24° E, where the 0.9996 scale factor makes them shorter.

The map was made in ArcGIS Pro in UTM zone 34N. The route, KP ticks, depth bands and profile were built with Python and arcpy, and the relief and seafloor shading with GDAL.